BOQ & Estimates

Quantities that add up, rates that hold

Prepare bills of quantities from drawings, build rates from material, labour and machinery, and compare estimate versions side by side before you quote.

How BOQ & Estimates works

BOQ & Estimates, step by step

Each step shows the screen your team works in.

Step 01 Take off quantities

Take off quantities

Enter measurements the way engineers write them - number, length, breadth, depth - with deductions for openings.

  • L x B x D measurement sheets
  • Deductions for doors and windows
  • Quantities linked to drawing references
Step 02 Analyse the rate

Analyse the rate

Build each rate from material, labour, machinery, wastage and overheads. Update cement or steel prices once and every rate that uses them moves.

  • Material, labour and machinery break-up
  • Wastage and contractor profit
  • Linked to your price master
Step 03 Compare versions

Compare versions

Keep every estimate version. See which items changed, by how much, and why, before the quote goes out.

  • Side-by-side version compare
  • Change reasons recorded
  • Tender and working estimate kept apart
Step 04 Hand over to execution

Hand over to execution

Once the work is won, the BOQ becomes the base for the schedule, material budgets, work orders and RA bills.

  • Material budget per item
  • Work orders priced from BOQ
  • RA bill items ready to measure
Capabilities

What else BOQ & Estimates handles

Built around how Indian sites actually run: offline phones, gangs and contractors, GST and running bills.

01

Excel import

Paste or import BOQs from Excel, including multi-level item numbering.

02

Price master

One list of material, labour and machinery rates by region and date.

03

SOR support

Load state PWD or CPWD schedules of rates and build on top of them.

04

Lead and lift

Add lead and lift charges for material carried beyond standard distances.

05

Abstract and detail

Print an abstract of cost and detailed measurement sheets for tenders.

06

GST ready

Apply GST rates per item and see tax-inclusive totals before quoting.

Project complete

Run BOQ & Estimates on your next project.

Every bar green. Handed over on the date you promised.

Bgwdhari
Work orderWO-0001
Issued to
Your next project
Scope
All eight modules, including the Delay Predictor
Duration
30 days
Users
Up to 10 from office and site
Card required
No
Rate
$0.00
Accepted by project manager